Skip to main content

Developed by Related Argent, Ashley Road West is a new build residential development in the heart of trendy Tottenham Hale, located alongside the newly established central square with a vibrant offering of shops, restaurants and bars. The building comprises a limited collection of 54 apartments in a modern open-plan design based upon high-quality specification.

The building also provides ample opportunity for ambient living as each apartment includes a private balcony, and all residents can enjoy the tranquil fifth-floor rooftop garden. The development is well-placed next to the brand new £30m Tottenham Hale station offering direct links to the City, the West End and London Stansted Airport via Victoria and National Rail lines.

Working in partnership with Pollard Thomas Edwards Architects, main contractor Galliford Try, and brickwork contractor Grangewood Brickwork, manufacturer Keyfix supplied 1,730m of its Non-Combustible Cavity Tray (NCCT), 492 Corner Units, 4,830 of Weeps and 546 Stepped Capping Pieces to this development.

The client specified the Keyfix NCCT as it was the most robust system on the market which also offered excellent value for money. Significantly, the Ashley Road West development featured a complex brickwork design whose assembly could be made more efficient using the Keyfix Non-Combustible Cavity Tray system.

The Keyfix technical team provided comprehensive support in developing a cavity tray solution, which allowed us to achieve the saw-tooth brickwork requirement of the building design.

  • Non-combustible Cavity Tray System
  • Non-combustible Cavity Tray Lintel
  • Non-combustible Retaining Disc
  • Non-combustible Weep
  • Stainless Steel Wall Ties & Fixings

About Keyfix

Keyfix is the market leading non-combustible cavity solutions provider for the entire external cavity. Keyfix is renowned for innovation, technically superior solutions and surpassing clients’ expectations.